Showing posts with label Red white blue. Show all posts
Showing posts with label Red white blue. Show all posts

Sunday, December 31, 2017

Last Stash Report 123117

Since this is the last day of the year, this is about as accurate a yearly report as there can be.

FABRIC IN: From my favorite thrift store.
Moda sea foam w/ dots, pink chenille & blue chenille = 0.76 yards for $0.75
Last fabric added for 2017

FABRIC OUT:
91 Reusable Sanitary Pads = 8.09 yards
91 pads ready to go

Center of Carnival Quilt (greens only since white was purchased specifically for this project and never counted in) = 1 yard
Carnival Quilt Center
Red White and Blue Quilt Backing = 10.10 yards
I missed getting a finished picture, but it is all sewn together now!!


Fabric Purchased the week:  0.76 yards
Fabric Purchased YTD: 101.98 yards


Fabric Acquired This Week: 0 yards
Fabric Acquired YTD: 46.04 yards

Fabric Used This Week: 19.19 yards for pads, carnival quilt center, RWB backing
Fabric Used YTD: 136.48 yards

Fabric Stashed in 2017: 11.54 yards stashed

Not bad at all considering how much fabric came in this year.  I am pleased with my year and in surpassing my goal of 100 yards out. 



Staying accountable with   quiltpaintcreate.  

Friday, December 29, 2017

The Last Friday Finish of 2017

Big finishes this week.  It is amazing how much sewing I can get done when I don't go to work!
My new walking foot made a huge difference on the pad project!!

The reusable sanitary pads project (Days for Girls) started with good intentions.  In October, when the other teachers and I finished with the pillowcases for Harvey victims we thought this would be another good cause.  I had plenty of materials on hand (surprise! surprise!) and we dove right in.  It turned out to be way more than we could chew.
Cute & practical

The straight sewing on the pillowcases was just right for their beginning to intermediate skills.  These were just the opposite.  Lots of layers, lots of curves, and zig zag stitching that needed to be precise.  All the fabric we started with had already been cut, so the only thing was for me to take them home and work away at it, which means it get set aside, but took up lots of space.
91 pads ready to pass on for pins & shipping.to Days for Girls

My recent plan was to make that be my priority project as soon as I got the sewing room cleaned up after Christmas.  The girls were gone for the afternoon after Christmas so I had completely uninterrupted sewing time - and no pressure for dinner since there are plenty of leftovers. I got the last 51 pads finished.  As a bonus I actually got a system going where I could piece the carnival quilt blocks in between pads.
Carnival Quilt Center
This week I also got the backing for the Red White & Blue quilt done at last.  I had almost all of the strips ready, but needed a large enough place to lay them out to decide on the placement and then cut the last two and sew them up.  This week I am not teaching, but I am tutoring so I took the pieces and used my classroom to lay it all out.  We have a sewing machine in the class so I just sewed them up as well.  HUGE RELIEF that this step is finished.
Red White & Blue Backing ready to sew
I have been trying and trying to figure out why the thread is breaking so much when I use my Brother machine on the frame for quilting.  I had narrowed it down to the darning foot and had gotten a replacement.  It didn't really make sense, but the foot had more then a few issues that had already been "fixed" so that I could still use it, so getting a new one was overdue anyways.  Sure enough when I reloaded the finicky quilt and tried again this week I had the same problem.  I now think it is the sheet as a backing that is causing the problem.  So I loaded this little one as a test on that theory.  After a not-so-smooth start I got in the groove and got it finished up in no time with no more thread breakage.
Test Quilt
CLEAN WORK SPACE 
+ DETERMINATION 
+ GIRLS GONE 
- WORK 
- DINNER 
= DONE DONE DONE

Linking up to Confessions of a Fabric Addict and Crazy Mom Quilts to show off finishes.



Friday, July 8, 2016

Stash Report 061016

I took two half days for me last weekend!!  They were very therapeutic and much needed.

I got the borders done on my red, white and blue quilt which was a much larger chunk out of the stash that I would have guessed, but then it turned out much larger than I planned also.  I am determined to get the backing out of stash as well, but that will be a few weeks down the road.  Lots of work related stuff coming up and no spare time in the foreseeable future.

Fabric Used/Out This Week: 2.66 yards
Fabric Used/Out in 2016: 39.16 yards


Fabric In This Week:  0 yards
Fabric In 2016: 30.75 yards
 

Net Used 2016:  8.41 yards


Staying accountable with Judy over at Patchwork Times


Monday, March 24, 2014

Sewing Blue Blocks at Last

I have been waiting and waiting to get started on the blue blocks.  I finished the red stars that can be seen here and here and here, but had to put off the blue blocks since other projects were higher priority.

The instructions for the blue blocks were for the use of a single blue and a single neutral.  I wanted mine to be scrappy - each block a different blue & neutral.  So it was a little bit of a slow start getting it worked out for a single block, but now I have a system down and I should be able to get the others done in my little bits of found time. 
I couldn't wait to get enough done to put them on the design wall - covering the quinceanos quilt that is still stalled!  I love the way it looks with the different reds, blues and neutrals.  Just how I envisioned it.  But I know that if I had made this back when I first started about 4 years ago or so it would not have come out this way.  My skills and tastes have definitely changed.





 I made myself finish the binding on the two baby quilts before I made many more blocks.  Now I can sew blue blocks without guilt that something else needs to be done first. Only 18 more blue blocks! This quilt is currently on the front burner now!

Linking up with Patchwork Times.  Head on over to see what's on some other design walls.

Also hooking up with Confessions of a Fabric Addict.  It's not a finish, but since I had to work extra this week any progress is good.

Sunday, February 2, 2014

Stash Report 020214

Finished the red stars.  World record progress for me!

They can be seen here.  So now I can count that as fabric used - yeah!  My self-imposed stash report rules are here.










Someone donated fabric at work and of course I picked out what might be usable for quilting.  I almost didn't since I was so proud of my 0 yards of fabric in so far this year, but then I thought "Free fabric, I'm in!" I was surprised at how hard I thought about it first.
 
This blog really is making me work harder to have finished projects and think twice about what I am using.  I was never one to buy a lot anyways, maybe sometimes for a backing.  But now I am really making do with what I have in my stash and getting more things done.

Fabric Used This Week:   3.6 yards from stash for red stars


Total Used 2014:  11 yards

Fabric In This Week:   7 yards from donation

Total Bought/Received in 2014: 7 yards

Net Used 2014: 4 yards

Thank goodness for the finished stars so I am still on the positive side!

Check out some other stash reports at Patchwork Times.

 

Friday, January 31, 2014

It's Friday and I Finally Finished ...

Not the whole quilt, but at least the stars.  The stars went very quickly once I started.  I don't think they would have gone this quickly way back when I picked this pattern and started that one block.  I have learned a lot since then and I think my quilts are coming together faster and more accurately.  If there was a turning point I would have to say it was following following Bonnie Hunter's Quiltville blog and then attending the Bonnie Hunter Smith Mountain Morning class.  I started to really put into practice what I had read and seen and it all clicked.

So after just 2 weeks I have gone from here to finishing the 32 stars.  Amazing productivity for me.  Now to start on the blue alternating blocks.  But I really need to quilt the pink & purple baby quilt.  It is headed to Guatemala for a future niece and I have to get it done in time to get there.

See some other finishes at Confessions of a Fabric Addict
and Crazy Mom Quilts. 


Monday, January 27, 2014

Design Wall Monday 012714

I am continuing with the red, white and blue quilt.  It's start can be seen here.

These stars are addictive.  I cut pieces out of most of the reds I had tucked away with this UFO.  Plus some of my mother's reds.  Same with the whites.  I did a few trial blocks to find which way works best for me to do the flying geese units, since I have not made any of them in a long time.  Now that I have it down to a system I am sewing 2 blocks together at a time.  They "lead & end" each other.  Then between every 2 blocks I get in the real leader & ender project - 2" squares for Dancing Nine Patch by Bonnie Hunter.

I really like the scrappy star points.  If I ever did this again I would do something more interesting in the block center.  But since it is a UFO and I am following the pattern - more or less - I will stick with the solid center for now.  That 5" square just looks like a blank canvas waiting to be played upon!  Next time.  I am definitely a much more scrappy quilter than when I started this 4 years ago.

The quinceanos quilt that is covering the design wall waiting for more signature blocks to come in is slowly being covered.  I like these red stars so much I don't want to just stack them up.  I don't have much wall space and the room has been added to and rearranged since I put up the design wall and now I can't really reach it.  So figuring that out seems like it should be a project too.

The pattern calls for 32 red stars.  I have 20 done - including the non-scrappy original block.  I had thought maybe I would unsew it and make it scrappy, but now I just think it will get included as is.

Go see some other Design Walls at Patchwork Times.