For a four-day work week I did not get as much done as I anticipated. But progress is progress.
 |
| Backing for the HST Quilt |
I got the backing and binding prepared for the HST Quilt. I had originally planned for just the maroon as the backing, but since I added an extra row all around, it was no longer large enough. I added the strip of stripe and I think it works well. The stripe also became binding.
 |
| Quilt, backing, and binding ready to go! |
Then I got out my next UFO to work on, but I was totally uninspired, so I thought about what to do with the orange & blue 9-patch blocks to make them large enough for anything. I had an idea that involved scraps, but it turns out I don't have as many orange scraps as I hoped. So back to the drawing board on that project.
But that jumpstarted me into the neglected UFO. I forgot that I had to take out another machine to Frankenstein the batting, but I just took a deep breath and did it. I got it pin basted, so quilting that should keep me busy for the coming week.
 |
| Baby panel ready for quilting. |
I missed sewing one day. Just too tired and that's okay.
15 Minute Report
15 minute days/week = 6/7
15 minute days/April = 17/18
15 minute days/2025 = 98/109
Success Rate = 90%
Even though I didn't get in sewing every day, what I did do helped my stash numbers.
2025 Stash Totals
Used last week: 5.28 yards for HST Quilt backing and binding
Used year to date: 39.91 yards
Acquired last Week: 0 yards
Acquired year to date: 7 yards
Net used in 2025: 32.91 more yards used