For a four-day work week I did not get as much done as I anticipated. But progress is progress.
![]() |
Backing for the HST Quilt |
I got the backing and binding prepared for the HST Quilt. I had originally planned for just the maroon as the backing, but since I added an extra row all around, it was no longer large enough. I added the strip of stripe and I think it works well. The stripe also became binding.
![]() |
Quilt, backing, and binding ready to go! |
Then I got out my next UFO to work on, but I was totally uninspired, so I thought about what to do with the orange & blue 9-patch blocks to make them large enough for anything. I had an idea that involved scraps, but it turns out I don't have as many orange scraps as I hoped. So back to the drawing board on that project.
But that jumpstarted me into the neglected UFO. I forgot that I had to take out another machine to Frankenstein the batting, but I just took a deep breath and did it. I got it pin basted, so quilting that should keep me busy for the coming week.
![]() |
Baby panel ready for quilting. |
I missed sewing one day. Just too tired and that's okay.
15 Minute Report
The pieced backing works nicely. Trying to move UFOs along is not easy. You are making progress. Some weeks you just need one day to rest. Your metrics are still looking very impressive.
ReplyDeleteI get the too tired thing. Pretty baby quilt.
ReplyDelete