Still no fabric in! My sister gave me some thrift store rejects, but I rejected them also and will move them along. It wasn't even cotton, so there was no temptation at all.
Sapphire Jubilee - mix of blocks from Part 1 and Part 2 |
Fabric Out: I finished Part 2 of the Quiltmaker Ruby Jubilee Mystery. Since my stash is heavy on blues, my mystery is a Sapphire Jubilee. I don't remember which blocks are Part 1 and which are Part 2, so this is a peek of what I have going so far. There are some blocks that I question, but at this point I will wait and see when it all comes together. I really need to get my flannel-backed tablecloth design wall hung back up. Part 2 is a total of 1.22 yards.
Sapphire Jubilee Parts 1 and 2 |
Fabric In This Week: 0 yards
Fabric In YTD: 14.5 yards
Fabric Out This Week: 1.22 yards
Fabric Out YTD: 9.42 yards
Stash Movement: 5.08 yards in
Slowly headed in the right direction.
As far as time spent sewing .......
Last weekend was very busy with hosting the family for my sister's birthday. Then Teacher E came for an overnight since it was her Spring Break. I didn't get a stash report written, but I only missed one day of sewing.
Prepping pieces to just pick up and sew is definitely a game changer. I was tempted this weekend to sit and sew what I prepped Friday evening, but then I reminded myself that I would have nothing to sew when I was tired during the week if I did that. I made a sample block for Part 3 of the Jubilee Mystery and then kitted up the pieces for the remaining blocks I need of that particular design. At this rate I finish a set of blocks each week.
Days of at least 15 minutes of sewing in March 30/31 and April 8/9
Days of at least 15 minutes of sewing in 2022: 75/85 88/99
Percentage: 89%
Linking up to Kate's Life in Pieces to share progress and stay accountable.
Congrats on the great stitching time metrics in spite of all the other things going on. Have a great week.
ReplyDelete