Saturday, May 3, 2025

April Finishes Bring May Motivation

I have to keep saying it because it is true.  Having a list is really keeping me focused.

My focus project this month was the HST Quilt.  I got the top all finished, and prepared a backing and binding to send with it to a generous finisher on its way to WNC for hurricane relief.

Then there was time left to get busy on the baby panel quilt.  Just enough time to push myself to an April finish!


Linking up to Miss P's Designs USA to share PHD progress.

Sewing Chicken Soup with Rice

At school when the kids need to hurry up, I will sometimes say "going once, going twice, going chicken soup with rice."  This week one student asked "why do you say that?"  Yesterday we had a Buddy Drill where we practice going to a classroom on the adjacent K-2 campus in case of an emergency on our campus.  While there, a student found an old copy of Chicken Soup with Rice.  It turns out that "going" is not actually in the poem!  But as I was thinking of other things that work, I landed on "sewing"!  I might need to come up with an sewing version of the poem!  Cutting once, ripping twice ...

Since it was the end of the month, I was motivated to get a finish.  I got the quilting and the binding done just in time.  I tried something new by quilting diagonal lines in the center and straight lines in the borders that resulted in cross-hatching in the corners. I am pleased and I think it helped to accent the center rather than distract from it.  Senor G really liked this one, so will take it on his next trip to Spain for friends there who are expecting.
Baby panel is done!

Thursday was my "day off" this week.  A very long day and I knew the best thing to do was just go to bed!  

The backing was exactly the right size.
Friday I rebounded and got the bucket of scraps dealt with while I listened to an audio book.  After that I was in a better frame of mind to grade papers. 

Processed scraps ready to join their like-sized friends.
I dug out the orange & blue project again, but I still don't have an plan I love, so I think I will pull out a different UFO to work on next.

15 Minute Report

15 minute days/week = 6/7
15 minute days/April = 26/30
15 minute days/May = 3/3
15 minute days/2025 = 127/141
Success Rate = 90%

Since I got the baby panel finished, I have stash movement to report.  

2025 Stash Totals
Used last week:  3.31 yards baby panel quilt
Used year to date: 43.22 yards
Acquired last Week: 0 yards
Acquired year to date: 7 yards
Net used in 2025: 36.22 more yards used

Linking up to Life in Pieces to share progress.
Linking up to quiltpaintcreate to show stash movement.

Monday, April 28, 2025

What I'm Working On

It was a boring week on the sewing front.  I got in the bare minimum and I didn't feel like I was creative at all, but I did make some progress.  During an on-line training I was cutting leader & ender parts!  I saw an idea I liked potentially for the orange/blue blocks, so I rearranged them on the design wall.  No rush, so I will stew on that for a while longer.

How did I do on the  To Do List for April 20-26?

  • quilt the blue/yellow/green baby panel  - PROGRESS
  • prep more parts for leaders and enders - PROGRESS
  • think about how to use the orange/blue 9-patches that are on the design wall - PROGRESS
To Do List for April 28 - May 4
  • finish quilting the blue/yellow/green baby panel
  • trim & bind the blue/yellow/green baby panel
  • prep more parts for leaders and enders
  • think about how to use the orange/blue 9-patches that are on the design wall
  • reclaim the sewing room after shoving stuff in there to make space in the guest room this past weekend

Saturday, April 26, 2025

Quick Check In

Later this afternoon is my niece's engagement party and I'm heading over shortly to help prepare.  Then Middle E and her husband will come for the event and the night.  The house is ready, but I want to spend as much time with them as possible, so this will be quick.

It was a busy week at school, so it was good that my sewing for the week had already been planned.  I was able to get a bit of quilting done on the panel quilt most every day. I'm using the walking foot for straight lines - that all I know how to do - so it is easy to work at in in short bursts.  15 minutes is adding up!

Baby panel getting quilted - slowly but surely.
Surprisingly, it was Monday that I was too tired to do anything.  I suspect that was a result of a three-day weekend that included travel.

15 Minute Report

15 minute days/week = 6/7
15 minute days/April = 23/25
15 minute days/2025 = 121/134
Success Rate = 90%

No finishes this week, so stash movement remains the same.

2025 Stash Totals
Used last week:  0 yards
Used year to date: 39.91 yards
Acquired last Week: 0 yards
Acquired year to date: 7 yards
Net used in 2025: 32.91 more yards used

Linking up to Kate's Life in Pieces to share progress.
Linking up to quiltpaintcreate to share stash movement.

Monday, April 21, 2025

What I'm Working On

How did I do last week?

To Do List for April 13-19:

  • make a baking for the HST quilt - DONE
  • make binding for the HST quilt - DONE
  • prepare the blue/yellow/green baby panel for quilting - DONE
  • possibly start the quilting - NO PROGRESS
  • prep more parts for leaders and enders - DONE
  • think about how to use the orange/blue 9-patches that are on the design wall - PROGRESS

Can I get this quilted this week?!?!

This week is more straight forward since I'm at the beginning of a project.

To Do List for April 20-26:

  • quilt the blue/yellow/green baby panel
  • prep more parts for leaders and enders
  • think about how to use the orange/blue 9-patches that are on the design wall

Saturday, April 19, 2025

Random Progress

For a four-day work week I did not get as much done as I anticipated.  But progress is progress.

Backing for the HST Quilt

I got the backing and binding prepared for the HST Quilt.  I had originally planned for just the maroon as the backing, but since I added an extra row all around, it was no longer large enough.  I added the strip of stripe and I think it works well.  The stripe also became binding.

Quilt, backing, and binding ready to go!

Then I got out my next UFO to work on, but I was totally uninspired, so I thought about what to do with the orange & blue 9-patch blocks to make them large enough for anything.  I had an idea that involved scraps, but it turns out I don't have as many orange scraps as I hoped.  So back to the drawing board on that project.  

But that jumpstarted me into the neglected UFO.  I forgot that I had to take out another machine to Frankenstein the batting, but I just took a deep breath and did it.  I got it pin basted, so quilting that should keep me busy for the coming week.

Baby panel ready for quilting.

I missed sewing one day.  Just too tired and that's okay.  

15 Minute Report

15 minute days/week = 6/7
15 minute days/April = 17/18
15 minute days/2025 = 98/109
Success Rate = 90%

Even though I didn't get in sewing every day, what I did do helped my stash numbers. 

2025 Stash Totals
Used last week:  5.28 yards for HST Quilt backing and binding
Used year to date: 39.91 yards
Acquired last Week: 0 yards
Acquired year to date: 7 yards
Net used in 2025: 32.91 more yards used

Linking up to Life in Pieces to share progress.
Linking up to quiltpaintcreate to show stash movement.

Monday, April 14, 2025

What I'm Working On

On the weekend I usually try to figure out what I'll work on during the week to keep up my forward momentum.  If I have to decide what to do when I get home from school, it is less likely to happen.  So to take that a step further, I thought I'd write it down to make myself more accountable.  I've seen other bloggers publish their "to do" lists and thought I'd give it a try.

To Do List for April 13-19:

  • make a baking for the HST quilt
  • make binding for the HST quilt
  • prepare the blue/yellow/green baby panel for quilting
  • possibly start the quilting
  • prep more parts for leaders and enders
  • think about how to use the orange/blue 9-patches that are on the design wall
HST Quilt needs backing and binding.

Baby Panel needs backing & quilting.

9 Patches need a plan.
More than enough for the week.  But it's a 4-day work week, so we'll see what happens.  We will be traveling next weekend to see the Savannah contingency, so I should probably pull out some handwork as well.