My week did not go how I imagined since I sewed what I had thought was my secondary project instead of the primary project. My idea for the twin baby girls was to use the remnants of a flowered charm park. There were enough duplicates to have a good start on a plan.
![]() |
Matching stacks of 5" blocks + a few extras. |
I would use those as a starting point and then add from the stash. I was on a roll, so I just kept rolling. I ended up getting the remaining squares cut, tested layouts,
![]() |
I used a B&W filter for the first time!! |
even added flowered borders. I had some ideas for backings and got those ready as well.
![]() |
The red-based backing from part of a tablecloth |
Since I was doing so well, I just kept going and got them both pin basted!
![]() |
Ready for quilting. |
15 Minutes to Stitch
15 minute days/last week = 5/7
15 minute days/August = 1/1
15 minute days/Sept = 4/6
15 minute days/2025 = 229/270
Success Rate = 85%
I got the tops done so will count that fabric as out this week. I'll wait to count the backings out until they are quilted.
2025 Stash Totals
Used last week: 3.7 yards
Used year to date: 89.73 yards
Acquired recently: 0 yards
Acquired year to date: 40.33 yards
Net used in 2025: 49.43 more yards used
Linking up to:
Donna @ quiltpaintcreate
Frederique @ quilting patch
No comments:
Post a Comment
Thanks for stopping by. Let me know what you think!