Friday, June 13, 2025

Baby Bears for a Friday Finish

Just after we found out that my nephew and his wife were expecting their first child, I found this fabric at my favorite thrift store.  I have been very good at not buying anything new, but Little S pointed out that this was not only super cute, but would be a good gender-neutral quilt for N&A.  The price was right - total 12.5 yards of fabric for $20!

I had planned to work on it during the summer and send down to Guatemala with Senor G in the fall to arrive in time for an early December baby.  But school was in its last days, so I decided to try to get it done to take down on our trip now.  The panel made it easy.  I just added the coordinating block fabric as wide borders and the backing.  

The block fabric wasn't wide enough to go all the way around without piecing and I didn't want to piece it poorly, so I looked for something in my stash for corners.  The yellow cherry fabric was perfect.  The red plaid was an option, but is better as the binding.  One of my favorite combinations ever I think.

For quilting, I went with my current favorite of a diagonal grid in the center panel.  Then straight lines in the borders, overlapping in the corners.  It was done in just a few days.  Whew!!  

They loved it.  N could not take his eyes off of it for a photo.  That made me glad that I had rushed to get it done in time to take now.  I had not known that their baby theme is bears, so this was just perfect for them.  Photos just aren't the same as being there to see someone's reaction.

Later this summer I will work on a flannel backed blanket with the large print coordinating fabric and some burp clothes.

Tuesday, June 3, 2025

May PhD Report

Another productive month.

I finished the cute dog panel baby quilt.

Puppy Baby Panel
I also had a new start and finish!  When I was packing the box to head to the quilt finisher for Hurricane Helene relief in WNC, I had space for one more.  Since I didn't have anything the right size in the works I decided to try for a "quick" quilt.  Large bricks for the win!!
Dragonfly Bricks



June is the start of my summer vacation since I'm a teacher.  I have had a really productive spring.  We will see if it carries over into the summer.  Other than a trip this coming week, I have no firm plans.  But there are a lot of things that need to be done on the house.  When I get back from the trip I am sure I will get into a summer groove and figure it all out.

 Linking up to Miss P Designs USA to share PhD progress.


Monday, June 2, 2025

What I Am Working On

 How did I do last week May 26 - June 1?

  • sew the columns for the impromptu dragonfly quilt  FINISHED
  • prepare a backing for the dragonfly quilt  NO PROGRESS
  • prepare binding for the dragonfly quilt  NO PROGRESS
  • try again to pack that box to send out to the quilt finisher!  NO PROGRESS
  • cut 300 2" squares from linen for a VBS craft project  FINISHED
  • cut strips from t-shirt for students to make dog toys  FINISHED
  • prepare hand work to take on our trip the following week  NO PROGRESS
I knew that I had possibly over-planned and with the addition of the emergency dress hemming, I am still pleased with my progress.

This week includes my one and only day of post-planning to pack up the classroom for the summer.  Then I will focus on preparing for our trip.  I will make a list and accept whatever progress I can make.  I would love to get the dragonfly quilt completely ready for shipping before the trip.

 To Do List for June 2-8:

  • prepare a backing for the dragonfly quilt 
  • prepare binding for the dragonfly quilt 
  • try yet again to pack that box to send out to the quilt finisher!
  • prepare hand work to take on our trip this week - yikes! 

Saturday, May 31, 2025

Plenty of Variety

It was the last week of school with students.  I had thought maybe I would not get much sewing in, but I was motivated to get the dragonfly brick quilt top finished this week.  No lesson plans or papers to grade worked in my favor.  I got a few columns ironed and added each day and then it was done!

Not the best randomization, but it will do.

My progress was interrupted by cutting up the remains of t-shirts from a huge t-shirt quilt for dog toys.  Most of the books we read aloud in class this year had a dog, so it seemed fitting to make dog toys.  I had intended for them to be donated, but the students were so excited and quick at making them that they each took one home - and there are still plenty left for donation.  

Lay out the strips and tie around the tennis ball.
Super successful!  I will write a detailed post about that project later.  Since the t-shirt remains ended up in my stash after giving the quilt to the client, I am going to count that as fabric out of the stash as well.
Choose 3 and braid!

I was distracted by a last minute call for help from an old friend who needed a formal dress hemmed.  Thankfully, it was a relatively simple hem.  She didn't want to keep the train and the lining was not attached at the hem.  Bonus: time spent catching up while pinning!

I surprised myself with 100% stitching time in May.  Woohoo!  All those little bits of time are adding up to finishes.

 15 Minute Report

15 minute days/week = 7/7
15 minute days/May = 31/31
15 minute days/2025 = 155/169
Success Rate = 92%


2025 Stash Totals
Used last week:  5.37 yards for dragonfly brick quilt + 10.5 yards for dog toys
Used year to date: 62.34 yards
Acquired last Week: 0 yards
Acquired year to date: 7 yards
Net used in 2025: 55.34 more yards used

Linking up to Life In Pieces to share progress.
Linking up to quiltpaintcreate to share stash movement.


Monday, May 26, 2025

What I'm Working On

 How did I do on last week's list?

  • plan & add borders to the Hexagon Baby quilt  NO PROGRESS
  • prepare a backing for the Hexagon Baby quilt  NO PROGRESS
  • send the red & green fruit quilt, the Illusions of County Clare quilt, and the HST quilt to the quilt finisher who will then send them on for hurricane relief in WNC  PROGRESS  
  • prep more parts for leaders and enders  NO PROGRESS 
  • reclaim the sewing room  NO PROGRESS

When I was packing up the quilts, I saw that I could fit another quilt in the box.  Not wanting to waste the space I made a quick decision to start a new quilt.  I went with something quick and that took all my sewing time last week.
Columns are ready to join. 

Here's the list for May 26 - June 1:
  • sew the columns for the impromptu dragonfly quilt
  • prepare a backing for the dragonfly quilt
  • prepare binding for the dragonfly quilt
  • try again to pack that box to send out to the quilt finisher!
  • cut 300 2" squares from linen for a VBS craft project
  • cut strips from t-shirt for students to make dog toys
  • prepare hand work to take on our trip the following week

Hmmm.... Considering it's the last week of school I might have over-planned.  But some of it has deadlines.  We'll see!

Saturday, May 24, 2025

Unexpected New Project

Things took off in a totally different direction this week.  I was packing up the box of quilt tops & backings to be sent for finishing and was surprised to find that I potentially had room in the box for another quilt.  I didn't have anything larger than a baby quilt that was in progress.  Starting a new quilt was not on my radar, but why not?!

All that is left of the original focus fabric.

I had just seen a video of a simple looking quilt made of layer cakes cut in half and arranged like bricks.  I didn't have a layer cake, but I could cut fabric in bricks.  I found a focus fabric and built from there.  I cut my bricks 5.5 x 10.5 to maximize the amount of fabric I had available.   

Placement has undergone many changes since this first try.

It turned out that what I pulled from my stash that remotely went together were not large pieces, so it got all used up.  A few bricks needed to be pieced, but I doubt they will be noticed in the end.

Barely anything left.

15 Minute Report

15 minute days/week = 7/7
15 minute days/May = 24/24
15 minute days/2025 = 148/162
Success Rate = 91%


2025 Stash Totals
Used last week:  0 yards
Used year to date: 46.47 yards
Acquired last Week: 0 yards
Acquired year to date: 7 yards
Net used in 2025: 39.47 more yards used

Linking up to Life in Pieces to share progress.
Linking up to quiltpaintcreate to share stash movement.

Monday, May 19, 2025

What I'm Working On

This was truly a slow week of just getting the bare minimum done, but even that saw some finishes!

How did I do on the list for May 12-18

  • bind the dog panel quilt  DONE
  • prepare binding for the red & green fruit quilt  DONE
  • send the red & green fruit quilt, the Illusions of County Clare quilt, and the HST quilt to the quilt finisher who will then send them on for hurricane relief in WNC  NO PROGRESS 
  • prep more parts for leaders and enders  NO PROGRESS 
  • reclaim the sewing room  NO PROGRESS 

To Do List for May 19 - 25
  • plan & add borders to the Hexagon Baby quilt
  • prepare a backing for the Hexagon Baby quilt
  • send the red & green fruit quilt, the Illusions of County Clare quilt, and the HST quilt to the quilt finisher who will then send them on for hurricane relief in WNC    
  • prep more parts for leaders and enders   
  • reclaim the sewing room