I am working backwards to catch up on fabric in and fabric out. Not sure if I have photos of things or not. At least I am taking the first step of getting things reported. Later I'll get details of the specific projects.
Fabric Out -
tropical hexagon quilt top finished - 4.38 yds
CWM commissioned baby quilt top - finished 3.24 yds
11 lined Halloween bags for craft fair - 2.2 yds
6 pincushion projects for October library class - 0.70 yds
mini basket for business cards - 0.3 yds
starter stash scraps given to student - 1.47
giveaway hexies - 0.5 yds
2 pillowcases Senor G took as hostess gift to Poland - 2.2 yds
striped flannel baby blanket w/ crochet edge - 1.35 yds
mother/daughter apron set for craft fair - 1 yd
Fabric In -
Hospice Thrift - 10.3 yds $10 - solid white, Christmas stripe, Christmas ornaments on green background, geometric Christmas trees
BEAM Thrift - bag misc scraps $1 - 1.5 yd
Fabric Purchased since last report: 11.8 yards
Fabric Purchased YTD: 106.81 yards
Fabric Acquired since last report: 0 yards
Fabric Acquired YTD: 22.65 yards
Fabric Used since last report: 17.34 yards
Fabric Used YTD: 153.9 yards
Total: 24.44 yards destashed