Saturday, November 15, 2025

Heading to the Finish Line

The end of the year is in sight and I am motivated to finish my UFO list!!  I got the last 2 flimsies sandwiched and pin-basted together.  

I started on Mr. D's quilt and despite still being affected by the time change, I made good progress.  

Quilting is underway.

I initially quilted a large X across each 6" block with the walking foot and that was alright.  But then I thought about how old the quilt was and how my skills and fabric were not great back then.  So I am now going back and stitching more closely in the small 4-patches that make up the blocks.  Tedious, but it gives me peace of mind that the quilt will hold together better in the long run. 

Additional quilting across the smaller patches.

I am hoping to have this one done by next weekend.  The plan is still to work on Dear Jane's binding over Thanksgiving even if I don't have these last two UFOs finished yet.

15 Minutes to Stitch

15 minute days last weeks = 5/7
15 minute days/Nov = 11/15
15 minute days/2025 = 279/339
Success Rate = 82%
 
Forward progress, but nothing to report out yet.  

2025 Stash Totals
Used last week: 0 yards 
Used year to date: 108.41 yards
Acquired recently: 0 yards  
Acquired year to date: 42 yards
Net used in 2025: 66.41 more yards used

Linking up to:

Frederique at quiltingpatch

2 comments:

  1. I like your plan with the additional quilting. May you finish quicker than you think! Mr. D's is looking terrific!--TerryK@OnGoingProjects

    ReplyDelete
  2. I like the quilting you are doing on this. Yes, it is a good idea to add extra quilting.

    ReplyDelete

Thanks for stopping by. Let me know what you think!